Skip to main content
Skip to main content
載入中

資料處理中

Highway Bureau, MOTC
The Highway Bureau is committed to provincial highway engineering, highway transportation management and highway supervision, simplifying administration and facilitating the people. The business scope is divided into three categories: road engineering, road transportation and road supervision, providing convenient and safe services for the public.
  • Overall Length: 20 kilometers
  • Total length of Tunnels: 13.1 kilometers (3 Tunnels)
  • Total length of Bridges:  4.0 kilometers (6 Bridges)
  • Total length of Road Embankment: 2.9 kilometers

Section  B (Middle Section) Length: 20 kilometers

  • A 12.6 km long tunnel system deploys a unique 60m long interconnecting bridge.
  • An adjacent disused railway tunnel is used for innovative construction.



Guanyin  Tunnel, Guyin Bridge, Gufeng Tunnel


  • The discovery of a cultural layer of archeological artifacts going back to the Bronze Age.


Blihun discovery of a cultural layer  archeological artifacts going back to the Bronze Age.